The operation process of the pure water production line

by:NEWLINE     2021-05-07
The running process of the purified water production line 2018-12-12 09:54 The complete machine of the purified water production line integrates the functions of washing, filling and capping. The whole is made of stainless steel, which is corrosion resistant and easy to clean. The machine adopts imported PLC control. The pure water production line has a compact structure, a small footprint, high efficiency and stability, and a high degree of automation. The running process of the purified water production line: When the drive motor is running with an empty bottle and enters the positioning induction zone with the induction sheet on the chain, the positioning induction switch sends a signal to stop the drive motor, and at the same time the washing bottle water pump starts, and the corresponding washing Disinfection work (washing time is controlled by PLC program setting); after washing, the washed empty bottle is transported by the bottle washing transmission mechanism and falls on the bottle pushing rack. The bottle pushing cylinder works to push the empty bottle to the filling position. Align the filling nozzle with the mouth of the water bottle, and when the pure water is rinsed, the filling pump starts filling. The filling time is adjusted by the user according to the needs. When the filling is full, the PLC sends a control signal, the filling solenoid valve is closed, and the filling is stopped. After the filling is completed, the next water bottle is used to send the filled water bottle to the cap sorting area Cover the cap and send it to the capping area. The capping cylinder drives the capping device to press the bottle cap tightly.
Custom message
Chat Online
Chat Online
Chat Online inputting...
Sign in with: