What do you need to set up a mineral water production line

by:NEWLINE     2021-06-05
What do you need to set up a mineral water production line? 2020-10-17 13:31 Mineral water is a fast-moving consumer product in summer. The production of mineral water is not intended to be a good business in summer. A small mineral water production line needs to be established. The following conditions are required first The site, how large and large the factory, such as 2000 bottles of beverages or water per hour, the minimum factory requirement is 600 square meters, but also close to the water source. 1. Water treatment equipment and reverse osmosis equipment filter mineral water totaling 40,000 to 60,000. 2. Filling machine. If the daily output is 1,000 pieces, and overtime production is possible, a 1,000-1,500 bottle/hour rotary filling line is sufficient. Generally, small mineral water filling companies will choose the filling machine of Niu Lan Machinery, with complete after-sales service, and optional equipment can be customized according to requirements. 3. Equipment materials and key components. In order to be durable, the equipment must be made of 304 or 316 stainless steel. In addition, pipes, valves, pumps, etc. need to be used well with low failure rate. 4. Blowing machine: Blowing mineral water bottles is the first link of the production line. The quality of the equipment directly affects the work of the subsequent equipment. Once a failure occurs, the entire production line will stop running. 5. Sleeve labeling machine and packaging machine: Sleeve label packaging and boxing of the produced mineral water bottles. 6. The height of the workshop is more than 4 meters and the area is more than 700 square meters (one line). 7. Fully automatic beverage filling production equipment can be won at about 300,000 yuan, but auxiliary facilities are relatively expensive, such as plant renovation, capping machines, personnel disinfection facilities, cleaning workshops, laboratories, etc., which are estimated to require 300,000 yuan for comparative insurance . 8. In addition, rent and reserve funds also need at least 300,000 yuan to prepare. 9. Therefore, it takes at least 1 million yuan to open a beverage factory that can produce stable quality and survive. 10. It should be noted that once they are opened, they cannot turn back. Investors in small beverage companies often only focus on equipment investment costs, ignoring supporting facilities, auxiliary facilities, start-up costs, reporting QS, custom molds, employee injury insurance, packaging design, Later costs and time costs such as plate making, recruitment, training, and trial production. Develop two or more plans and emergency measures, and implement them cautiously. The mineral water machinery of Niulan Machinery adopts foreign advanced technology and combines the characteristics of our country to research and develop by itself. It uses a lot of new technologies, new processes and new structures. It has excellent quality. The neck of the bottle is stuck between the bottle fixing plate and the upper forming plate. The bottle is turned upside down by the clamp driven by the star wheel, so as to realize the three processes of cleaning, filling and sealing. In addition, all parts of the mineral water filling equipment in contact with the liquid are made of 304 stainless steel or food engineering plastics, which have abrasion resistance and oxidation resistance. Most of its electrical system uses imported parts. This machine has standard food hygiene, stable and reliable performance, low failure rate, fully automatic control and perfect after-sales service. It is very popular among customers at home and abroad. It is an ideal equipment for various beverage production enterprises.
Custom message
Chat Online
Chat Online
Chat Online inputting...
Sign in with: